6. Wellhead Area

Four wellpairs have been drilled and tied in. A fifth single horizontal well has also been drilled and tied in.

The pipe rack modules for the wellheads are used to control injection of steam, Propane, blanket gas, Diluent and production rates.

A nuclear magnetic resonance measuring device, located in a small building on the south side of the pipe rack, measures oil, water and produced gas in emulsion steam.

At the end of the pipe rack is a steam condensate tank, which is used to start up the steam lines.

Off the edge of the well pad on the north side is the on-site disposal well, bracketed by two additional on-site source water wells. These are connected to the source water tank and the disposal water tank via underground lines.

< Back | Saleski Plot Plan | Next >